YALIKAVAK INDUSTRIAL SITE

Start Date: March 2015

End Date: September 2015

LOCATION:

It stands out with its location on the road to Gündoğan and Göltürkbükü in Yalıkavak, the favorite of Bodrum, which has become a Trade Center.

PROJECT PLAN STRUCTURE:

It is located on a plot of 2000 m2.

It has a single block and uniform interior design;

It consists of 18 INDEPENDENT modern buildings; Ground Floor 9 and Upper Floor 9.

MATERIALS USED IN THE PROJECT:

  • According to the geological soil survey study reports; C-30 quality concrete and İDÇ brand structural steel were used by applying raft foundation system in the buildings.
  • Roof water insulation has been applied in the buildings.
  • Halogen free materials are used in electrical installations.
  • Production was carried out according to the latest earthquake regulation principles.
  • Basically, drainage system has been implemented.
  • The foundation and ground floor curtain are insulated against moisture and water.
  • In the intermediate partitions, masonry bricks are used.
  • There is a “SPECIAL PARKING” for each workplace.